Services & Delivery

Diagnosis → Pilot → Implementation → Acceptance → Maintenance → Expansion: documentation itself is a deliverable; O&M is quantifiable and assessable.

Six-stage delivery process

1

Diagnosis

Pain-point diagnosis + data baseline measurement — we agree with the customer to "measure first, then calculate": collect baseline data first, then discuss improvement targets and scope.

1.5

Pilot

When the scope can be circled, start with a small-scale pilot and agree on acceptance criteria first; cycles and indicators without confirmed values are confirmed by both parties after investigation.

2

Implementation & commissioning

Start with standardized engineering templates (I/O allocation / point list / network topology / screen specification first), using platform assets to reduce delivery risk; for retrofit projects, construction is managed without stopping production.

3

Acceptance documentation

Documentation itself is a deliverable — per the contract and project scope, deliver the user manual, database table specification, interface specification, point list atlas and other agreed materials, supporting the customer's future management, queries and extensions; the specific list follows the technical agreement.

4

Annual maintenance

Standardized maintenance contracts, year-by-year rolling maintenance checklists, annual maintenance report templates — O&M is quantifiable and assessable. Decade-level continuous service records on file.

5

Expansion

Advance phase-two expansion based on project scope and on-site assessment, prioritizing compatibility with existing investments.

Delivery documentation system (14 categories)

Project proposalTechnical agreementSpecification (specification sheet)I/O allocation tableAddress allocation tableNetwork topology diagramScreen design specificationOperation and user manualDatabase table specificationData interface specificationTest reportAcceptance documentationMaintenance checklistAnnual maintenance report

The specific list follows the technical agreement.

High-reliability engineering practice

Architecture level

Redundant clusters, dual-machine hot standby, database RAID1, 7×24 operation, second-level screen refresh.

Network level

Industrial/office network isolation, gigabit fiber Layer-3 switching, dual-NIC isolation, high-risk file filtering.

Data level

Store-and-forward / offline caching (committed at the contract-clause level), three-year data retention with archival to the history database.

Compliance level

GMP data integrity, the permissions / roles / audit trio, fire-linkage safety design.

Commitment level

Key indicators such as outage backfill collection and alarm accuracy — we dare to write them into technical agreement acceptance.

Training & enablement

Complementary operator training + a systematic in-house engineer curriculum (PLC / servo / network / SCADA configuration); customized technical training available on request — delivery is enablement.

Five cooperation models

ModelSuitable scenarios
Turnkey project New-build or retrofit digitalization projects — five-layer full stack delivered by one partner
Annual maintenance Long-term health assurance and continuous evolution of existing systems
Productized solution procurement Rapid rollout of mature products such as FMCS/MES templates, the EMS series, and O&M clients
Joint application Government qualification applications such as smart workshops, green factories, and first-set breakthroughs
Joint development Co-creation pilots for forward-looking scenarios such as AI and digital twins

Tell us about your site conditions to get a targeted diagnosis and phased solution proposal