Home Appliance Manufacturing
Retrofit legacy lines without stopping production; systems evolve year by year, and O&M is quantifiable and assessable.
Industry pain points
- Legacy lines have mixed equipment and frequent modifications, and construction cannot stop production.
- Systems become islands three to five years after build, and no one takes over long-term O&M.
- Foreign-invested factories have high IT project gates: solutions must be demonstrable and systems must be able to evolve.
Our solution
- Companion-style line retrofits: starting from single-point visualization and evolving year by year along the customer's IT roadmap — OPC data integration, whole-line MES, dedicated retrofits (press / clutch / bundling), facility energy, server renewal; no rip-and-replace for ten years.
- Whole-line MES: zone PLC aggregation, large-screen mapping, unified database; a dual system of rolling screens and event pop-ups, with pass rate judged automatically by the host PC per machine model.
- Test bench systems: motor / complete-unit performance test benches — three types of heterogeneous equipment unified in one network (controllers via coupler to ModbusTCP zone PLCs, winding machines via touch-screen adapters, inspection equipment directly connected to the database), inspection data automatically reported.
- Annual maintenance system: standardized maintenance contracts, year-by-year rolling maintenance checklists, annual maintenance reports — O&M quantifiable and assessable.
Representative projects
- A Japanese-invested home appliance group (Shanghai plant): more than ten years of continuous service on washing machine lines.
- A compressor company: compressor test data collection system.
- A Japanese-invested air-conditioning company: compressor SCADA and vision-based packing project.
Capability extensions
- OEE efficiency analysis, facility energy upgrades to EMS.
- AI quality judgment (reserve direction).
Buying scenarios and conversion paths
Target roles
- · Plant manager
- · Manufacturing engineering lead
- · IT manager
Trigger events
- · Legacy line retrofit needed but production cannot stop
- · Maintenance gaps or no one to take over O&M
- · Foreign IT project requirements demanding demonstrable solutions
Product pilot path
When your product requirements are already clear: start with a 15-minute demo and a small-scale pilot — you can begin with a single-line MES and Andon pilot.
Book a Product DemoFull project path
When you only have an industry-level question: start with an on-site diagnosis and a phased proposal. Production line MES, Andon, test benches and annual maintenance, built in phases.
Request an On-site DiagnosisRelated Anonymous Case
A Japanese-invested home appliance group: a decade of production line digitalizationRetrofit legacy lines without stopping production — first talk through how to evolve in phases.
Tell us about your industry and site conditions to get a diagnosis and phased solution proposal.
Request an On-site Diagnosis